164 Prospect Park South / West Brooklyn, NY 11218
Type of Work: Brick Work
Year Completed: 2020-09-24
Font of the 1st floor stair, we will remove the old stair. Dug to 4'' a depth. Make level and prepare the ground to accept new concrete mix. then wire mesh will be laid on top; 4000 PSI mix cement. Then install new step by brick. Then we will put the old blue stone on the stair.